Case Studies

Here's a list of case studies from previous work...

Bury College

Bury

Lewis Ashley Services Ltd has recently completed our fourth project for Bury College which now totals around 4,500m2 with a total value of around £1,800,000. These have comprised of a 10 bay, 2 storey modular building with 4 classrooms on each floor, a single storey 5 bay high tech print room and 2no 3 storey 48 bay modular buildings.  The latest installation comprises a 3 storey building using 48 bays of 12m x 3.1 sections, of mainly classroom units of 45m2 each, with full carpeting, cat 2 lighting and fitted with electronic white boards and digital display monitors. There are multi-media IT rooms on each floor and welfare facilities including facilities for the disabled.  This building is being used as a decant facilities whilst new traditional buildings are being constructed.  We provided a full turnkey package including foundations and drainage provided by our dedicated groundworks division, installation with a 120 tonne crane, co-ordinated by our appointed person and experienced and qualified installation team and fitted out by our teams of skilled tradesmen.

Read More

High Craggs

Highcraggs

We have undertaken several projects worth up to £150,000 each for Bradford MDC, including a 2 storey office block with vinyl coated plasterboards to all internal walls and Plastisol coated steel cladding externally.  The building was supplied complete and ready to use with heating, lighting and welfare facilities installed. We also supplied 3no multiple bay Modular Buildings for hire on an ongoing basis, these included double classrooms with cloakroom and storage areas.  The most recent building supplied was a high specification 2 bay classroom extension at High Crags School.  This included a monodraught airflow monitored air-conditioning system, this ensured a regulated change of air through the building. The external walls were a combination of Yorkshire stone and eternity equitone fibre façade. This was a design and build project using our own in house facilities. The building which we supplied included heating, lighting, dado rail telecoms/data system, and a mixture of carpet and vinyl flooring.

Read More

Kingsland School, Wakefield

Kingslandschool

When Kingsland School in Wakefield needed extra classroom accommodation quickly to meet a new term deadline and following selection through the authority’s competitive tender procedure, Lewis Ashley Group were awarded the contract and provided a full turn-key package for a totally refurbished modular building to cater for their needs. Our first job was to excavate and reduce the ground level, before supplying a full foundation of concrete pad’s, this was then followed by the installation of a 4 bay building 10m x 12m equalling 120m2 in total floor space complete with kitchen, paediatric toilets for boys and girls complete with cloakroom facilities plus a doc M pack Disable toilet facility. This included all power and data cabling, plumbing and electrics and air conditioning within a suspended ceiling system which allowed all the services to be run within the fabric of the building, the fitting of anti-slip vinyl flooring and carpeting was also included. External works included for all ramps and pathways around the building. All work was carried out during the summer holiday period and ready for occupation on time, on budget and ready when the new term began.

Read More

London Borough of Croydon Schools Project 2013

Croydon

We provided a 6 classroom building at Parish Church School, The building arrived on site with pre-installed vinyl coated plaster board to internal walls and Plastisol coated steel externally, each of the classrooms were fitted with heating, lighting and carpeted throughout. We also supplied 2no 4 bay double classroom buildings at the Phillip Edwards Centre, these buildings were completely fitted out prior to installation according to specification and were installed and commissioned ready for the new term stat dates. We also supplied and installed a complete 2 classroom building at Ecclesborne School in Croydon. Later we installed and commissioned a new classroom block and carried out a full refurbishment of an existing modular building at Forest Hill School.  We ensured that we communicated with all parties throughout including the client, architect, city planners, chief fire officer and building control.  The total spend was in the region of £750,000.

Read More

Oaklands Primary School

Oaklands

Once again EC Harris have procured another modular project for a school in Ealing, one of 5 projects Lewis Ashley Group won this year in the area via EC Harris, delivering the project on time and within budget, this school provided a challenge for logistics as it was operational whilst the Olympic games were at their peak. A 5 bay building that was to be attached to an existing classroom with a high spec interior, new canopy and platform, there was also lots of additional works which Lewis Ashley Group have took in their stride and worked through on behalf of the client. Another example of Lewis Ashley’s willingness to work with clients, companies and councils alike to bring their visions to fruition.

Read More

The Minster Church of England Infant and Nursery School, Croydon

Parishchurchschool

After successfully negotiating the tender process the client ordered a single modular building plus a 7 bay modular to be installed and fitted out over the summer period. They specified a modern style building of approximately 200m² with a mixture of rooms and services be provided. This was to include 4 No Animal Care/teaching rooms each to be no less than 30m², a student recreation room of approximately 25m², W/C provision, male, female and disabled, circulation space and a small office of approximately 10m² with a sink unit, with hot and cold water provision, heating, lighting and electrical outlets throughout. Completed on budget and on time within 2 months, the logistics proved a challenge with regards to materials and working around the colleges personnel because it is a busy working agricultural college. This was overcome by good team management and liaising regularly with the client and the contractors.

Read More